top of page
 
 
The Foothill- De Anza Education Center houses instructional facilities, classrooms and lecture rooms, administrative offices and support spaces. The building is appox. 46,000 GSF, Four spaces with different functional purposes will be disscussed within the lighting and electrical topoics of the study. Addtional Mechanical and construction breadthes will be focusing on study the existing building systems. 

 
 
 

Images courtsey of Lionakis

Foothill De-Anza  Education Center

Capstone Project Electronic Portfolio

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.

Images courtsey of Lionakis

 

 

   05/01/2016                                           CPEP ready for review

   04/28/2016                                           ABET Survey Posted 

   04/24/2016                                           CPEP Redfelction Posted 

   04/08/2016                                           Final Reoort Updated

   04/02/2016                                           Final Report Posted

   03/30/2016                                           Final Presentaion Slide    

   12/12/2015                                           Tech Report IVB 

   10/19/2015                                           Building Stats II 
   09/09/2015                                           Thesis Abstract 
   09/03/2015                                           Tech Report I 

   09/02/2015                                           Building Stats Part I
   09/02/2015                                           Student Bio Posted
   08/13/2015                                           Owner Permission


 

 

 

 

 

 

 

 

 

News & Feeds

Images courtsey of Lionakis

FootHill De-Anza Educational Center is currently under construction. Targeting at building a net-zero educational center, the educational center fosters the following interesting design features.

 

  • Automatic Sprinkler System 

  • Recycled gournd-up debris from demolished concrete parking garage being spread out as compacted fill over the whole site

  • Steel Structure with Special Concentric Braced Frames

  • Non-elasticc brace rotation provided in plane vs. out of plane 

  • Radiant floor heating and cooling with assited wall-louver natural ventilation 

 

 

 

 

Images courtsey of Lionakis

Images courtsey of Lionakis

While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewithin is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Chang Deng. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

This page was last updated on May 1st, 2016 by Chang Deng and is hosted by the AE Department ©2015

bottom of page